Extensive damage was caused to this Chesterfield residents driveway.
We removed the damaged asphalt and debris.Next we leveled the aggregate as best as possible and installed a leveling course of soil adjacent to the pavement repair.We installed 4 corrective courses of pavement and compacted each course with a vibratory plate compactor. Installing multiple courses or layers of asphalt will ensure the strongest repair possible.The final surface is installed and rolled with a vibratory roller. The repair is completed with a total of 6-8" of compacted asphalt.www.ccpstl.com www.anythingasphalt.com 314-427-3303